MB Century was engaged for services to support Fuji Electric in the design of the Steam Gathering System for Muara Laboh Power Station in West Sumatera Province of Indonesia.


Objective

Providing a timely and cost-effective solution for the process design service, including sizing and detailing of the separation plant and the scrubbing and steam gathering system. Further technical and commissioning support.

 
Muara Laboh Geothermal Power Plant_Indonesia.jpg
Geothermal Steamfield Design-Muara Laboh SS1.png
Steamfield Design-Muara Laboh SS1 diagram.jpg
 
 

Project type
Dual flash separation plant, pressure let down station and steam gathering system.

Client
Fuji Electric

Plant
PowerStation type/MW

Location
Indonesia

Date
2018 to 2020

Software
AutoPIPE, Micro Station, NozzlePRO, Memdes, Solid Works FEA.

Partners
PT. Rekayasa Industries.

Codes/standards


MB Century

  • Design of dual flash separation plant, piping and pressure let down station for the Muara Laboh stage 1 power station undertaken by our Geothermal engineering and design team based in Taupo, New Zealand.

  • Process and piping design 

  • Onsite commissioning assistance provided


Responsibilities
Project manage the design process

Supply engineering drawings, calculations & specifications

Process design

Mechanical design

Separator plant and scrubber design

Commissioning support


Project outcome
Successful and timely completion of commissioning. Operational since 2019.